A/E/C/FM Integration [C]Construction Research Congress,2008: 934-938.
[2]Issa J, Ramaji. Product -Oriented Information DeliveryFramework for Multistory Modular Building Projects [J]. Journal ofComputing in Civil Engineering, 2017:04017001.
[3]Issa J. Ramaji,Ali M. Memari. Information ExchangeStandardization for BIM Application to Multi -Story ModularResidential Buildings [J]. American Society of Civil Engineers,2015: 78-93.
[4]Faraj I, Alshawi M, Aouad G, et al. An industry foundationclasses Web-based collaborative construction computer environment[J]. Automation in Construction, 2000, 10(1): 79-99.
[5]Vanlande R, Nicolle C. Ifc and building lifecyclemanagement[J]. Automation in Construction, 2009, 18(1):70-78.
[6]Kang Y , O Brien W J , O Connor J T . Analysis ofinformation integration benefit drivers and implementationhindrances[J]. Automation in Construction, 2012: 277-289.
[7]Hameri AP, Nitter P. Engineeringdata management throughdifferentbreakdown structures in a large -scale project [J].International JournalofProjectManagement,2002,(20):375-384.
[8]Wu I C, Hsieh S H. A framework for facilitating multi -dimensional information integration, management and visualizationin engineering projects [J]. Automation in Construction, 2012, 23(none):71-86.
[9]Viljamaa E, PeltomaaI.Intensified construction processcontrol using information integration[J]. Automation in Construction,2014, 39(4):126-133.
[10]Hyunjoo Kim,Kyle Anderson. Generating constructionschedules through automatic data extraction using open BIMtechnology[J].Automation in Construction,2013,35:285-295.
[11]Miroslaw J. Skibniewski, Tsung Wei Hung. Effects ofBuilding Information Modeling During Construction [J]. Journal ofApplied Science and Engineering,2014,2:157-166.
[12]Dennis R. A review of building information modeling andthe internet of things (IoT) devices ntegration: Present status andfuture trends [J]. Automation in Construction,2019,101:127-139.
[13]Peter Demian,David Walters. The advantages ofinformation management through building information modelling[J].Construction Management and Economics,2013: 37-41.
[14]Burcin Becerik -Gerber. The perceived value of buildinginformation modeling in the US building industry [J]. Journal ofInformation Technology in Construction,2010.
[15]刘占省,刘诗楠,王文思,赵玉红,于嘉琪.基于低功耗广域物联网的装配式建筑施工过程信息化解决方案[J].施工技术,2018,47(16):117-122.
[16]王威.基于 BIM 和物联网技术的装配式构件协同管理方法研究[D].广东工业大学,2018.
[17]刘美霞,邓晓红,刘佳,徐秀杰,王全良,张中,王广明.基于物联网技术的装配式建筑质量追溯系统研究 [J]. 住宅产业,2016(10):41-47.
[18]邱芬,彭小华,李萍.装配式建筑质量检测信息采集仿真研究[J].计算机仿真,2018,35(09):431-434.
[19]张楠.基于移动终端的工程质量安全信息采集系统开发及应用[J].施工技术,2016,45(18):29-32.
[20]赖华辉,邓雪原,刘西拉.基于 IFC 标准的 BIM 数据共享与交换[J].土木工程学报,2018,51(04):121-128.
[21]钟炜,姜腾腾.基于 BIM 的建筑工程项目多利益方协同机制框架研究[J].土木建筑工程信息技术,2014,6(05):95-101.
[22]张洋.基于 BIM 的建筑工程信息集成与管理研究[D].清华大学,2009.
[23]张德海,韩进宇,赵海南.BIM 环境下如何实现高效的建筑协同设计[J].土木建筑工程信息技术,2013,5(06):43-47.
[24]颜勤,宋晓宇“. Mars+VR”—提升建筑设计信息传递效率的新工具[J].建筑技艺,2018(11):117-119.
[25]王巧雯,张加万.基于建筑信息模型的建筑多专业协同设计流程分析[J].同济大学学报(自然科学版),2018,46(08):1155-1160.
[26]龙晴,沈良峰,张志东.装配式住宅施工阶段 WBS 应用研究[J].施工技术,2017,46(16):47-52.
[27]任志涛,郭林林,郝文静.基与 BIM 的装配式建筑项目集成管理模型研究[J].建筑经济,2018,39(09):27-30.
[28]陈勇强,孙春风.大型工程建设项目信息集成管理研究[J].石油工程建设,2007(03):57-60,9.
[29]张健,陶丰烨.基于 BIM 技术的装配式建筑集成体系研究[J].建筑科学,2018,34(01):97-102.